Site Preparation

When preparing your location for the  arrival of the shed, there are several options that will insure your structure has a level foundation upon which to sit.

gravel pad ready for shedshed on prepared siteblocks can be used for shed base

For smaller buildings, a solid, level surface will often suffice.

Another foundation option is patio blocks placed avery 6' to 8' under each runner. The ground should be fairly level to use this option.

A good option is a gravel pad. It is best to have four inches of gravel and to allow at least one foot additional space around the building.

Note: Site preparation and permits are the customer's responsibility.